Skip to main content

Table 4 Mean of the immediate and delay tests of Material 1 in all groups

From: Improving English reading for EFL readers with reviewing kit-build concept map

Group

N

Mean immediate

Mean delay

SD immediate

SD delay

Summarizing method (C)

78

6.7308

6.0000

1.9585

2.1861

Kit-build (E1)

77

7.2468

6.5844

1.5145

1.6650

Kit-build with source-connection (E2)

77

7.8701

7.3117

1.2392

1.6484